Separate fixed services from finishes
Plumbing moves, electrical, extraction, and waterproofing are the expensive surprises. Tile and paint are visible but often not the whole story.
Get trade input on services before you fall in love with a tile that needs a perfectly flat wall you do not have yet.
Materials you can self-estimate
Floor area for flooring or tile, wall board if you are reboarding, and paint for ceilings and any painted walls. Use the Flooring, Drywall, and Paint calculators for those lines.
Roll them into the Cost Estimator with labour allowances and a contingency of 15–20% for wet rooms in older houses.
Sequence to protect money
Demolish and expose problems early. Sign off waterproofing before tiling. Order long-lead fixtures only after dimensions are confirmed.
Changing a shower tray size after tiling starts is how small bathrooms become expensive bathrooms.
What calculators cannot do
They will not size soil pipes, confirm tanking systems, or guarantee mould-free ventilation. Those need qualified trades and product-system instructions.
They also will not price permit fees, skip hire, or temporary accommodation if the bathroom is the only one in the house — add those as separate budget lines when relevant.
Keep a dated photo set of the room before demolition. It helps trades quote accurately and helps you explain changes if scope expands.
Use a calculator for this
Project Cost Estimator
Roll materials, labor, delivery, waste, and optional markup into a planning total.
CalculateFlooringFlooring Calculator
Work out how many boxes of flooring to buy for a room, with waste included.
CalculatePaintingPaint Calculator
Estimate how much paint a room needs, based on wall area and coats.
CalculateHome ImprovementDrywall Calculator
Work out how many plasterboard or drywall sheets a room needs, including the ceiling.
CalculateFrequently asked questions
Should I renovate around existing plumbing?
Keeping services in place usually saves money. Moving a toilet or shower drain is a different project class.
Is a full gut always required?
Not if surfaces and waterproofing are sound. A cosmetic refresh is cheaper — but only after an honest inspection of leaks and substrate.
How much contingency should a wet room carry?
Many planners use 15–20% in older homes because hidden water damage is common. Treat contingency as untouchable for upgrades.