Project Cost Estimator

Enter the cost lines you already know. The estimator adds waste to materials, then labour and delivery, applies optional markup, and shows a range so the figure is clearly an estimate — not a contractor quote.

Project costs

Add the line items you already know. Leave labour or delivery at 0 if you are only pricing materials. Currency follows the unit toggle (USD for US, GBP for UK).

$
$
$
%

Applied to materials only

%

Optional. Homeowners can leave this at 0; contractors can add margin.

Results

Estimated total
$4,131 – $5,049

Shown as a range (±10%). This is a planning figure, not a quote.

Materials + waste
$2,640
Subtotal before markup
$4,590

Local labour rates, access, and finish choices move this number. Use the material calculators to build the materials line, then confirm with a supplier or contractor before you spend.

How this is calculated

A project total is not a single material quantity. It is materials (with waste), labour, delivery or skip hire, and — for trades — markup. Keeping those lines separate makes it obvious which part of a quote you can check with a calculator and which part is labour.

The result is shown as a ±10% range because local rates and unforeseen work move the number. This tool does not look up regional prices; you supply the inputs from supplier quotes or from the material calculators on this site.

Formula & methodology

Materials with waste = Materials × (1 + waste %). Subtotal = materials with waste + labor + delivery. Total = Subtotal × (1 + markup %). Range = Total × 0.9 to Total × 1.1.

Worked example

Materials $2,400, labor $1,800, delivery $150, 10% waste, 0% markup

  1. 1.Materials with waste = 2,400 × 1.10 = $2,640
  2. 2.Subtotal = 2,640 + 1,800 + 150 = $4,590
  3. 3.No markup → planning total $4,590
  4. 4.Shown as a range: about $4,130 – $5,050

Frequently asked questions

Is this a substitute for a contractor's quote?

No. It is a way to organise numbers you already have so a quote is easier to compare. Structural work, permits, and site conditions are not priced here.

Should homeowners add markup?

Usually no. Markup is for a trade quoting a job. Homeowners can leave it at 0% and still add a contingency in the waste line or in a separate savings buffer.

How do I fill the materials line?

Run the relevant calculators (concrete, paint, flooring, and so on), note the estimated material cost on each, and add them together here.

Why show a range instead of one total?

A single figure looks more precise than a planning estimate is. A range makes it clear that local prices and extras will move the number.

Last updated 2026-08-01. Formulas are planning methods — confirm with a supplier before you order.