Concrete Cost Calculator

A concrete quote is rarely just the truck. Enter slab size, your ready-mix rate, a labour line per cubic yard or cubic metre, and any pump or short-load fee to build a planning total before you call suppliers.

Slab to price

ft
ft
in
Add cost details
%
$
$
$

Results

Order quantity
1.96 yd³

Includes 10% waste

Materials
$303
Labour
$88
Planning total
$352 – $430

Formwork, reinforcement, and finish upgrades are not included.

How this is calculated

Volume and waste follow the same method as the Concrete Calculator. Materials multiply order quantity by your ready-mix price — the number on the quote sheet from the plant.

Labour per unit volume is a simplified way to compare contractor bids. Finishing, forming, and reinforcement are not broken out; adjust the labour rate to reflect what your market includes.

Formula & methodology

Order = Volume × (1 + waste %). Materials = Order × $/yd³. Total = Materials + (Order × labour rate) + fees.

Worked example

A 12 ft × 12 ft patio, 4 in, $155/yd³, $45/yd³ labour

  1. 1.Volume ≈ 1.78 yd³; with 10% waste → 1.96 yd³
  2. 2.Materials ≈ $304
  3. 3.Labour ≈ $88
  4. 4.No pump fee → planning total near $390 before finish upgrades

Frequently asked questions

What is a short-load fee?

Ready-mix plants often surcharge orders under 3–4 cubic yards because the truck still has to run. Put that charge in the pump/fee field.

Does this include forming and rebar?

No. It is volume, mix, and pour labour only. Curved forms, mesh, and pump hire are extras.

Stamped or coloured concrete?

Finish upgrades are priced per square foot on top of plain concrete. Increase the labour rate or add a line in the Project Cost Estimator.

How do I get the ready-mix price?

Call two local plants with your zip or postcode and ask for price per cubic yard delivered. Prices move with fuel and demand.

Bag mix instead?

For small volumes use the Concrete Bag Calculator. This tool assumes ready-mix delivery.

UK ready-mix?

Toggle to metric for price per cubic metre and labour per m³.

Last updated 2026-09-01. Formulas are planning methods — confirm with a supplier before you order.